Current Project
While the owners were on vacation a waterline in the bathroom broke. The bathroom, bedrooms, kitchen, dining and living areas were flooded. We removed the damaged flooring, cabinets and drywall. After the home was dried out and tested for moisture, we rebuilt including new kitchen and flooring.